TM 5-3895-382-24
7.
Use the following procedure to disassemble first stage
carrier (5).
a.
Locate pin (17) that holds bearing shaft (18) in carrier
(19).
b.
Drive pin (17) into bearing shaft (18) until it bottoms.
Make sure the pin has bottomed or damage to the
carrier could occur when the bearing shaft is
removed.
c.
Remove bearing shaft (18) from carrier (19). Remove
pin (17) from bearing shaft (18).
d.
Slide planet gear (16) and four thrust washers (14)
from carrier (19).
e.
Remove 19 needle bearings (15) from the inside of
planet gear (16).
f.
Repeat steps (a) through (e) for each of the two
remaining planet gears.
8.
Use the following procedure to disassemble second
stage carrier (10).
a.
Remove retaining ring (23) which holds planet gear
(20) and roller bearing assembly (21) on carrier (25).
b.
Remove planet gear (20) and roller bearing assembly
(21) from the carrier.
c.
Remove roller bearing assembly (21) from planet gear
(20).
d.
Repeat steps (a) through (c) to remove the remaining
two planet gears and roller bearing assemblies from
carrier (25).
e.
Remove retaining ring (24), and remove sun gear (22)
from carrier (25).
16-29