TM 5-3895-379-23-1
0121
INSTALLATION - Continued
4.
Slide hose (Figure 6, Item 4) up tube (Figure 6, Item 3) and tighten two hose clamps (Figure 6, Item 2) to
connect hose to turbocharger (Figure 6, Item 1) and tube.
CAUTION
Turbocharger must be pre-lubricated or damage to turbocharger will occur when engine is
started.
5.
Add clean engine oil to oil inlet on turbocharger (Figure 6, Item 1) until full. Refer to KEY in (WP 0071), Field
Maintenance Preventive Maintenance Checks and Services (PMCS) Introduction, for correct grade of oil. Spin
turbine wheel several times in order to lubricate the bearing.
6.
Refill oil inlet with oil.
1
2
4
M0498SWR
3
Figure 6.
Turbocharger Installation.
03/15/2011Rel(1.8)root(maintwp)wpno(M00059)