TM 5-3895-379-23-1
FIELD MAINTENANCE
TURBOCHARGER REPLACEMENT
INITIAL SETUP:
Personnel Required
Tools and Special Tools
Construction Equipment Repairer 91L (2)
Tool Kit, General Mechanic's: Automotive
(Volume 2, WP 0289, Table 1, Item 39)
References
(Volume 2, WP 0289, Table 1, Item 42)
TM 5-3895-379-23P, Figure 25
Materials/Parts
Antiseize Compound
(Volume 2, WP 0288, Table 1, Item 8)
Equipment Condition
Rag, Wiping
Engine off. (TM 5-3895-379-10)
(Volume 2, WP 0288, Table 1, Item 60)
Operator platform assembly raised.
Gasket (Volume 2, WP 0290, Table 1, Item 51)
(Volume 2, WP 0235)
Qty: 1
Gasket (Volume 2, WP 0290, Table 1, Item 63)
Qty: 1
0121-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00059)