• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Turbocharger Installation
TURBOCHARGER REPLACEMENT

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  593    594    595    596    597  598  599    600    601    602    603  
img
.
TM 5-3895-379-23-1
0121
INSTALLATION - Continued
7.
Install new gasket (Figure 7, Item 3) and tube assembly (Figure 7, Item 4) on turbocharger (Figure 7, Item 2)
with two screws (Figure 7, Item 1). Tighten screws to 25 lb-ft (34 Nm).
1
4
3
2
M0499SWR
Figure 7.
Turbocharger Installation.
8.
Install hose (Figure 8, Item 2) on intake manifold (Figure 8, Item 1) and tighten two hose clamps
(Figure 8, Item 3).
9.
Install hose (Figure 8, Item 6) on turbocharger (Figure 8, Item 4) and tighten hose clamp (Figure 8, Item 5).
1
2
3
4
5
6
M0500SWR
Figure 8.
Turbocharger Installation.
END OF TASK
0121-7
03/15/2011Rel(1.8)root(maintwp)wpno(M00059)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.