TM 5-3895-379-23-1
FIELD MAINTENANCE
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) (ANNUAL)
INITIAL SETUP:
Tools and Special Tools
References (cont.)
Tool Kit, General Mechanic's: Automotive
(Volume 2, WP 0289, Table 1, Item 39)
Materials/Parts
Lubricating Oil, Gear, 80W-90 Grade
(Volume 2, WP 0288, Table 1, Item 37, 38,
Volume 2, WP 0235
39)
Volume 2, WP 0256
Lubricating Oil MIL-L-2104 OE/, 10 Grade
Volume 2, WP 0257
(Volume 2, WP 0288, Table 1, Item 51, 52,
Volume 2, WP 0262
53)
Volume 2, WP 0263
Personnel Required
Equipment Condition
Horizontal Construction Engineer 12N
Park roller. (TM 5-3895-379-10)
Construction Equipment Repairer 91L
Drums chocked. (TM 5-3895-379-10)
References
DA PAM 750-8
Table 1.
Preventive Maintenance Checks and Services (PMCS) (Annual) for CB534 Roller.
ITEM TO BE
EQUIPMENT
ITEM
MAN
CHECKED OR
NOT READY/
NO.
INTERVAL
HOURS
SERVICED
PROCEDURE
AVAILABLE IF:
1
Annual
Engine Air Intake Replace air cleaner primary and secondary
System
1,000 hours of operation, whichever comes
first.
2
Annual
0.7
Hydraulic Oil
Hours
(Volume 2, WP 0257) every 12 months or
1,000 hours of operation, whichever comes
first.
3
Annual
1.5
Front and Rear
Hours
Propel
every 12 months or 1,000 hours of
Gearboxes
operation, whichever comes first.
4
Annual
Rollover
Every 12 months or 1,000 hours of
Cracks, broken welds,
Protective
operation (whichever comes first), check for
loose attaching bolts,
Structure
damage such as cracks or broken welds.
compromising dents,
(ROPS)
Check attaching bolts for tightness. Ensure
holes, or bends are found.
structural integrity: no compromising dents,
holes, or bends.
03/15/2011Rel(1.8)root(pmcswp)wpno(I00008)