• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Vibration Push Switch Removal.
Figure 4. Vibration Push Switch Installation.

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  877    878    879    880    881  882  883    884    885    886    887  
img
.
TM 5-3895-379-23-1
0167
INSTALLATION
1.
Install new preformed packing (Figure 3, Item 7) and nut (Figure 3, Item 13) on handle pipe
(Figure 3, Item 8). Turn nut onto handle pipe until top of nut is flush with top of handle pipe.
2.
Install two wires (Figure 3, Item 12) on vibration push switch (Figure 3, Item 3) with two screws
(Figure 3, Item 4).
3.
Install two new gaskets (Figure 3, Item 5) in grip housing (Figure 3, Item 14).
NOTE
Grip housings will not fit together if any threads of handle pipe are showing on top side
of nut while nut is installed.
Mate flat sides of nut with cavity on grip housing.
4.
Install grip housing (Figure 3, Item 14) on handle pipe (Figure 3, Item 8), nut (Figure 3, Item 13), and new
preformed packing (Figure 3, Item 7).
5.
Install vibration push switch (Figure 3, Item 3) in grip housing (Figure 3, Item 14).
6.
Install grip housing (Figure 3, Item 9) on grip housing (Figure 3, Item 14) with two screws (Figure 3, Item 4),
four screws (Figure 3, Item 6), and six nuts (Figure 3, Item 10).
1
2
3
4
11
12
10
5
5
13
14
6
7
9
10
8
M1228SWR
Figure 3. Vibration Push Switch Installation.
0167-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00105)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.