• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Vibration Push Switch Removal.
Figure 3. Vibration Push Switch Installation.

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  876    877    878    879    880  881  882    883    884    885    886  
img
.
TM 5-3895-379-23-1
0167
REMOVAL - Continued
NOTE
Nuts are small and easily lost. Take extra care to not lose nuts.
Nuts may stay with grip housing.
3.
Remove two screws (Figure 2, Item 4), four screws (Figure 2, Item 6), and six nuts (Figure 2, Item 10) from
grip housings (Figure 2, Items 9 and 14).
4.
Remove two grip housings (Figure 2, Items 9 and 14) from handle pipe (Figure 2, Item 7) and vibration push
switch (Figure 2, Item 3).
5.
Remove two gaskets (Figure 2, Item 5) from grip housing (Figure 2, Item 14). Discard gaskets.
6.
Remove two screws (Figure 2, Item 11) and wires (Figure 2, Item 12) from vibration push switch
(Figure 2, Item 3).
7.
Remove nut (Figure 2, Item 13) and preformed packing (Figure 2, Item 7) from handle pipe (Figure 2, Item 8).
Discard preformed packing.
1
2
3
4
11
12
10
5
5
13
14
6
7
9
10
8
M0899SWR
Figure 2. Vibration Push Switch Removal.
END OF TASK
0167-3
03/15/2011Rel(1.8)root(maintwp)wpno(M00105)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.