• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Vibration Push Switch Installation.
FUEL LEVEL GAUGE REPLACEMENT

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  878    879    880    881    882  883  884    885    886    887    888  
img
.
TM 5-3895-379-23-1
0167
INSTALLATION - Continued
7.
Tighten grip housings (Figure 4, Items 3 and 5) on handle pipe (Figure 4, Item 4) by turning grip housings to
right until snug. Do not over-tighten.
8.
Install cap (Figure 4, Item 2) and retaining ring (Figure 4, Item 1) on grip housings (Figure 4, Items 3 and 5).
1
2
3
5
4
M0900SWR
Figure 4. Vibration Push Switch Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Remove chocks. (TM 5-3895-379-10)
END OF TASK
END OF WORK PACKAGE
0167-5/6 blank
03/15/2011Rel(1.8)root(maintwp)wpno(M00105)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.