TM 5-3895-379-23-1
0134
INSTALLATION - Continued
8.
Position clamp (Figure 8, Item 3) on overlap of top port of muffler (Figure 8, Item 4) and tube assembly
(Figure 7, Item 1) and tighten nuts (Figure 8, Item 2) to 203-328 lb-in (23-37 Nm).
9.
Position clamp (Figure 8, Item 5) on side port of muffler (Figure 8, Item 4) and install exhaust tube
(Figure 8, Item 6) in muffler.
10.
Position clamp (Figure 8, Item 5) on overlap of side port of muffler (Figure 8, Item 4) and exhaust tube
(Figure 8, Item 6) and tighten nuts (Figure 8, Item 1) to 203-328 lb-in. (23-37 Nm).
2
3
1
5
6
4
M0613SWR
Figure 8.
Muffler and Tailpipe Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close right and left-side door assemblies. (TM 5-3895-379-10)
2.
Remove chocks. (TM 5-3895-379-10)
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00072)