TM 5-3895-379-23-1
FIELD MAINTENANCE
COLD START HEATER REPLACEMENT
INITIAL SETUP:
Personnel Required
Tools and Special Tools
Construction Equipment Repairer 91L
Tool Kit, General Mechanic's: Automotive
(Volume 2, WP 0289, Table 1, Item 39)
References
(Volume 2, WP 0289, Table 1, Item 41)
TM 5-3895-379-23P, Figures 16 and 34
(Volume 2, WP 0289, Table 1, Item 42)
Equipment Condition
Engine off. (TM 5-3895-379-10)
Materials/Parts
Operator platform assembly raised.
Cap Set, Protective, Dust and Moisture Seal
(Volume 2, WP 0235)
(Volume 2, WP 0288, Table 1, Item 12)
0130-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00068)