• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Valve Cover and Breather Tube Installation.
Figure 6. Valve Cover and Breather Tube Installation.

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  500    501    502    503    504  505  506    507    508    509    510  
img
.
TM 5-3895-379-23-1
0101
INSTALLATION - Continued
4.
Position breather tube (Figure 5, Item 4) through bracket (Figure 5, Item 1).
5.
Feed breather tube (Figure 5, Item 4) from bottom to valve cover connector (Figure 6, Item 8).
6.
Install bracket (Figure 5, Item 1) to engine (Figure 5, Item 3) and tighten screw (Figure 5, Item 2) to 22 lb-ft
(30 Nm).
1
2
3
4
M0122SWR
Figure 5. Valve Cover and Breather Tube Installation.
7.
Install breather tube (Figure 6, Item 10) to valve cover connector (Figure 6, Item 8) with hose clamp
(Figure 6, Item 9). Tighten hose clamp.
8.
CB534B Roller, install engine lifting bracket (Figure 6, Item 5) and clip (Figure 6, Item 12) to cylinder head
(Figure 6, Item 6) with three washers (Figure 6, Item 14) and screws (Figure 6, Item 13). Tighten screws to
33-47 lb-ft (45-64 Nm).
9.
CB534B Roller, install engine lifting bracket (Figure 6, Item 5) on radiator bracket (Figure 6, Item 4) with washer
(Figure 6, Item 3), washer (Figure 6, Item 2), bolt (Figure 6, Item 1), washer (Figure 6, Item 3), washer
(Figure 6, Item 2), and new locknut (Figure 6, Item 15). Tighten locknut to 33-47 lb-ft (45-64 Nm).
10.
CB534C Roller, install engine lifting bracket (Figure 6, Item 7) and two bolts (Figure 6, Item 11). Tighten bolts
to 33-47 lb-ft (45-64 Nm).
0101-6
03/15/2011Rel(1.8)root(maintwp)wpno(M00040)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.