1.
Remove two locknuts (10), washers (11) and screws (12) from frame assembly (13) and operator platform assembly (9).
Discard locknuts.
WARNING
15
16
Use caution when handling heavy parts.
Provide adequate support and use assis-
9
tance during procedure. Ensure that any
lifting device used is in good condition
and of suitable load capacity. Keep clear of
HOIST
WIRE
heavy parts supported only by lifting
POSITION
ROPE
device. Failure to follow this warning may
HOIST
cause injury or death.
CAUTION
Operate wire rope hoists evenly to
decrease chance of equipment failure.
2.
With assistance, use wire rope hoists to lower operator
platform assembly (9) until platform rests on frame
14
assembly (13).
CHAIN
3.
Remove wire rope hoists from each chain and eyelets
in handrail assemblies (15) and (16).
4.
Remove short section of chain from cutout in each
front side of yoke assembly (14).
5.
Install two screws (12), washers (11) and locknuts (10)
in storage locations in frame assembly (13). Tighten
locknuts to 48-55 lb-ft (65-75 Nm).
6.
Install four washers (8), screws (7), washers (6) and
10
nuts (5) in operator platform assembly (9). Tighten
9
11
13
12
nuts to 60-90 lb-ft (81-122 Nm).
PLATFORM
7.
Pull pin assembly (3) up and rotate operator station
LOCKING HOLE
(4) completly clockwise or counterclockwise for-
ward position. Release pin assembly ensuring that
401-727
pin is securely seated in hole in operator platform.
8.
Close right- and left-side door assemblies (TM 5-3895-379-10).
9.
Place handrail assemblies in operation position (TM 5-3895-379-10).
10.
Remove chocks (TM 5-3895-379-10).
END OF WORK PACKAGE