• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Operator Platform and Operator Station Installation
OPERATOR PLATFORM AND OPERATOR STATION REPLACEMENT - Continued

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 2 Page Navigation
  99    100    101    102    103  104  105    106    107    108    109  
img
.
TM 5-3895-379-23-2
0236
INSTALLATION - Continued
16.
Connect hose assemblies (Figure 20, Items 1 and 2).
1
2
M0764SWR
Figure 20. Operator Platform and Operator Station Installation.
17.
Connect wiring harnesses (Figure 21, Items 3 and 4).
18.
Install two nuts (Figure 21, Item 1) and clamp (Figure 21, Item 2).
1
2
3
4
M0765SWR
Figure 21. Operator Platform and Operator Station Installation.
END OF TASK
0236-13
03/15/2011Rel(1.8)root(maintwp)wpno(M00174)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.