• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Operator Platform and Operator Station Removal.
Figure 12. Operator Platform and Operator Station Installation.

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 2 Page Navigation
  94    95    96    97    98  99  100    101    102    103    104  
img
.
TM 5-3895-379-23-2
0236
REMOVAL - Continued
19.
Remove two bolts (Figure 11, Item 6).
20.
Remove two bolts (Figure 11, Item 5), nuts (Figure 11, Item 4), and clamp (Figure 11, Item 2) from hose
assemblies (Figure 11, Item 3).
21.
Clean and inspect bearing assembly on operator platform (Figure 10, Item 2). If bearing is warped or damaged,
replace operator platform (Figure 10, Item 2).
1
2
3
6
5
4
M0756SWR
Figure 11. Operator Platform and Operator Station Removal.
END OF TASK
INSTALLATION
1.
Install two bolts (Figure 12, Item 5), nuts (Figure 12, Item 4), and clamps (Figure 12, Item 2) to hose assemblies
(Figure 12, Item 3).
2.
Install two bolts (Figure 12, Item 6).
0236-8
03/15/2011Rel(1.8)root(maintwp)wpno(M00174)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.