• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Operator Platform and Operator Station Installation
Figure 18. Operator Platform and Operator Station Installation

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 2 Page Navigation
  97    98    99    100    101  102  103    104    105    106    107  
img
. .
TM 5-3895-379-23-2
0236
INSTALLATION - Continued
8.
Install bolts (Figure 16, Item 1) and locknuts (Figure 16, Item 2).
1, 2
M0760SWR
Figure 16. Operator Platform and Operator Station Installation.
9.
Raise operator platform (WP 0235).
10.
Install bolt (Figure 17, Item 2) to clamp (Figure 17, Item 3) on hose assemblies (Figure 18, Item 1) and
(Figure 17, Item 1) and the frame.
11.
Connect hose assembly (Figure 17, Item 1).
1, 2, 3
M0761SWR
Figure 17. Operator Platform and Operator Station Installation.
0236-11
03/15/2011Rel(1.8)root(maintwp)wpno(M00174)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.