TM 5-3895-379-23-1
0196
INSTALLATION - Continued
16.
Install wire (Figure 29, Item 7) on B+ terminal (Figure 29, Item 6) of alternator (Figure 29, Item 5) with washer
(Figure 29, Item 8) and nut (Figure 29, Item 9). Tighten nut to 60-72 lb-in. (7-8 Nm).
17.
Install wire (Figure 29, Item 3) on D+ terminal (Figure 29, Item 4) of alternator (Figure 29, Item 5) with washer
(Figure 29, Item 2) and nut (Figure 29, Item 1). Tighten nut to 12-16.8 lb-in. (1.35-1.9 Nm).
4
3
2
1
5
6
7
98
M1039SWR
Figure 29. Engine Wiring Harness Installation.
18.
Connect engine wiring harness connector (Figure 30, Item 1) to water temperature sensor connector
(Figure 30, Item 2).
1
2
M1040SWR
Figure 30. Engine Wiring Harness Installation.
03/15/2011Rel(1.8)root(maintwp)wpno(M00134)