TM 5-3895-379-23-1
0190
INSTALLATION - Continued
4.
Install cable (Figure 5, Item 15) on positive (+) terminal (Figure 5, Item 3) of battery (Figure 5, Item 11) and
negative (-) terminal (Figure 5, Item 17) of battery (Figure 5, Item 16) with nuts (Figure 5, Items 1 and 18).
5.
Install cable (Figure 5, Item 9) on positive (+) terminal (Figure 5, Item 12) of battery (Figure 5, Item 16) with
nut (Figure 5, Item 4). Tighten nut securely.
6.
Install cable (Figure 5, Item 8) on negative (-) terminal (Figure 5, Item 10) of battery (Figure 5, Item 11) with
nut (Figure 5, Item 5). Tighten nut securely.
2
4
5 6
7
8
1
18
3
9
17
16
10
11
12
15 13 14
13
M1053SWR
Figure 5. Battery Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Lower operator platform assembly. (Volume 2, WP 0235)
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00128)