• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Drum Select Switch Installation.
VIBRATION CONTROL SWITCH REPLACEMENT

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  832    833    834    835    836  837  838    839    840    841    842  
img
.
TM 5-3895-379-23-1
0158
INSTALLATION - Continued
4.
Install panel assembly (Figure 6, Item 3) on operator station (Figure 6, Item 4) with two washers
(Figure 6, Item 5), seven washers (Figure 6, Item 2), and nine screws (Figure 6, Item 1).
1
3
1
2
2
4
5
1
M0868SWR
Figure 6. Drum Select Switch Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close right-side door assembly. (TM 5-3895-379-10)
2.
Remove chocks. (TM 5-3895-379-10)
END OF TASK
END OF WORK PACKAGE
0158-5/6 blank
03/15/2011Rel(1.8)root(maintwp)wpno(M00096)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.