• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Fuel Injection Pump Installation
FUEL INJECTOR LINES AND FITTINGS REPLACEMENT (CB534B)

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  540    541    542    543    544  545  546    547    548    549    550  
img
. . .
TM 5-3895-379-23-1
0113
FIELD MAINTENANCE
FUEL INJECTION PUMP TEST AND ADJUSTMENT (CB534B)
INITIAL SETUP:
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0132
(Volume 2, WP 0289, Table 1, Item 39)
Personnel Required
Construction Equipment Repairer 91L
ON-ENGINE SPEED DROOP GOVERNOR ADJUSTMENT
1.
Start engine and apply approximately 50 percent load until engine reaches normal operating temperature.
NOTE
If engine surges during warm-up period, turn speed droop adjusting cap clockwise until
surging stops.
2.
When engine has reached operating temperature, position throttle to get full load speed and apply 100 percent
load. Adjust throttle if necessary to obtain satisfactory 100 percent load performance.
3.
Remove load and check for no-load speed. If incorrect, adjust speed droop adjusting cap in small increments
(turn clockwise for increased droop or counterclockwise for less droop.) If surging exists when load is removed,
turn speed droop adjusting cap clockwise to eliminate.
NOTE
When speed droop adjustments are made, throttle position adjustments (WP 0132) will also
be necessary.
4.
Recheck 100 percent load and no-load performance and readjust as necessary.
END OF TASK
END OF WORK PACKAGE
0113-1/2 blank
03/15/2011Rel(1.8)root(maintwp)wpno(M00051)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.