TM 5-3895-379-23-1
0096
INSTALLATION - Continued
2
1
5
4
3
M0102SWR
Figure 5. Engine Oil Cooler Lines and Fittings Installation.
7.
Place clamp (Figure 6, Item 3) on hose (Figure 6, Item 2).
8.
Install hose (Figure 6, Item 2) on hose (Figure 6, Item 4) and tighten clamp (Figure 6, Item 3).
9.
Place clamp (Figure 6, Item 5) on hose (Figure 6, Item 2).
10.
Install hose (Figure 6, Item 2) on oil cooler assembly (Figure 6, Item 6) and tighten clamp (Figure 6, Item 5).
11.
Place clamp (Figure 6, Item 7) on hose (Figure 6, Item 8).
12.
Install hose (Figure 6, Item 8) on oil cooler assembly (Figure 6, Item 6) and tighten clamp (Figure 6, Item 7).
13.
Place clamp (Figure 6, Item 9) on hose (Figure 6, Item 8).
14.
Install hose (Figure 6, Item 1) in hose (Figure 6, Item 8) and tighten clamp (Figure 6, Item 9).
1
9
2
3
8
4
7
5
6
M0103SWR
Figure 6. Engine Oil Cooler Lines and Fittings Installation.
03/15/2011Rel(1.8)root(maintwp)wpno(M00035)