TM 5-3895-379-23-1
0073
Table 1. Preventive Maintenance Checks and Services (PMCS) (Annual) for CB534 Roller - Continued.
ITEM TO BE
EQUIPMENT
ITEM
MAN
CHECKED OR
NOT READY/
NO.
INTERVAL
HOURS
SERVICED
PROCEDURE
AVAILABLE IF:
5
Annual
Platform
Every 12 months or 1,000 hours of
Cracks, bad welds, or
operation (whichever comes first), raise
missing bolts are found.
platform assembly (Volume 2, WP 0235).
Check platform hinges for cracks, welds,
and missing bolts. If rust is present, wipe
away with wire brush or abrasive material
and repaint.
HINGE
BOLTS
ROPS
PLATFORM HINGE
I0038SWR
Figure 1. Platform.
6
Annual
Batteries
Every 12 months or 1,000 hours of
Worn or damaged battery
operation (whichever comes first), inspect/ cables.
7
Annual
0.5
Vibratory Bearing Change vibratory bearing reservoir oil
Hours
Reservoirs
(Volume 2, WP 0262) every 12 months or
1,000 hours of operation, whichever comes
first.
8
Annual
Drum Scrapers
Check scraper every 12 months or 1,000
Scraper is damaged or
hours of operation (whichever comes first), cannot be adjusted.
and replace if damaged or worn beyond
adjustment (Volume 2, WP 0263).
9
Annual
Water Spray
Drain and flush system
Damaged or broken water
System
spray system parts found.
(TM 5-3895-379-10) every 12 months or
1,000 hours of operation, whichever comes
first. Check for damaged parts. Replace or
service damaged parts.
10
Annual
Radiator
Pressure test radiator (WP 0135) every 12 Radiator fails pressure
test.
months or 1,000 hours of operation,
whichever comes first. Replace radiator
cap as needed.
03/15/2011Rel(1.8)root(pmcswp)wpno(I00008)