TM 5-3895-379-23
PRESSURE OVERRIDE RELIEF (POR) VALVE PRESSURE TEST (CB534C)
THIS WORK PACKAGE COVERS
Pressure Override Relief Valve Pressure Test
INITIAL SETUP
Tools and Special Tools
Equipment Condition
Drums chocked (TM 5-3895-379-10)
Engine on (TM 5-3895-379-10)
References
Replacement
TM 5-3895-379-23P, Figures 7, 75 and 83
PRESSURE OVERRIDE RELIEF VALVE PRESSURE TEST
1.
2.
Place propel control lever in NEUTRAL position (TM 5-3895-379-10).
3.
Connect pressure gauge to tap (1).
4.
Loosen Pressure Override Relief Valve (POR) setscrew (2) and turn needle valve thumbscrew (3) fully clockwise
to close POR valve (4).
5.
Set speed range switch to HIGH SPEED position (TM 5-3895-379-10).
1
2,3
4
401-2023