TM 5-3895-379-23
TOOLBOX REPLACEMENT
0137 00
INSTALLATION
1.
Install toolbox (2) on operator platform (6) with two screws (4), washers (5) and nuts (3). Tighten nuts to 35 lb-ft (47
Nm).
2.
Close lid (1) of toolbox (2).
1
4
5
2
6
3
401-2048
3.
Remove chocks (TM 5-3895-379-10).
END OF WORK PACKAGE
0137 00-2