INSTALLATION
NOTE
Use lifting device to position vibratory and propel pumps.
1.
Install with two bolts (Figure 2, Item 20) to roller.
2.
Install valve (Figure 2, Item 15) to propel pump (Figure 2, Item 2).
3.
Install nut (Figure 2, Item 17) and bolt (Figure 1, Item 18) that fasten clip (Figure 2, Item 19) to hose assemblies
(Figure 2, Items 1 and 16).
4.
Connect two hose assemblies (Figure 2, Item 14) to vibratory pump (Figure 2, Item 11).
5.
Connect three hose assemblies (Figure 2, Item 1) to propel pump (Figure 1, Item 2).
6.
Install electrical tiedown straps and move wiring harness (Figure 2, Item 10) aside from vibratory control valve
(Figure 2, Item 9).
7.
Install two electrical connectors (Figure 2, Item 8) and two screws (Figure 2, Item 7) to vibratory control valve
(Figure 2, Item 9).
8.
Install two electrical connectors (Figure 2, Item 13) and two screws (Figure 2, Item 12) to vibratory pump
(Figure 2, Item 11).
9.
Connect two electrical connector wires (Figure 2, Item 6).
10.
Connect hose assemblies (Figure 2, Items 3 and 4) to propel pump (Figure 2, Item 2).
11.
Connect four hose assemblies (Figure 2, Item 5) and hose assembly (Figure 2, Item 16) to vibratory control
valve (Figure 2, Item 9).