TM 5-3895-379-23-1
0197
INSTALLATION - Continued
5.
Install two new lockwashers (Figure 14, Item 3), wires (Figure 14, Items 2 and 5), washers (Figure 14, Item 6),
and screws (Figure 14, Item 1) on horn assembly (Figure 14, Item 4).
1
2
6
5
3
4
M0297SWR
Figure 14. Front Wiring Harness Installation.
6.
Connect water spray pump connector (Figure 15, Item 1) to front wiring harness connector
(Figure 15, Item 2).
1
2
M0298SWR
Figure 15. Front Wiring Harness Installation.
7.
Install two wires (Figure 16, Item 1) on right-front work light assembly (Figure 16, Item 5) and tighten two screws
(Figure 16, Item 6).
8.
Install right-front work light assembly (Figure 16, Item 5) on bracket (Figure 16, Item 3) with screw
(Figure 16, Item 2) and nut (Figure 16, Item 4).
03/15/2011Rel(1.8)root(maintwp)wpno(M00135)