TM 5-3895-379-23-1
0197
INSPECTION AND TESTING
Wiring and electrical inspection and repair is presented in General Wiring Repair (WP 0195). Electrical testing is
presented in Electrical General Maintenance Instructions (Volume 2, WP 0280).
END OF TASK
REMOVAL
NOTE
Remove electrical tiedown straps as required.
Tag and mark all wires prior to REMOVAL.
Tag and mark general position of wiring harness in chassis as components are removed.
Harness will need to be repositioned at start of installation.
1.
Remove nut (Figure 1, Item 6), washer (Figure 1, Item 5), and two wires (Figure 1, Item 4) from frame assembly
(Figure 1, Item 3).
2.
Disconnect front wire harness connector (Figure 1, Item 2) from connector (Figure 1, Item 1).
1
2
6
5
4
3
M0284SWR
Figure 1.
Front Wiring Harness Removal.
3.
Loosen eight nuts (Figure 2, Item 3) on four brackets (Figure 2, Item 1).
4.
Remove bottom nuts (Figure 2, Item 3) and screws (Figure 2, Item 4) and pull front wiring harness
(Figure 2, Item 2) through brackets (Figure 2, Item 1).
03/15/2011Rel(1.8)root(maintwp)wpno(M00135)