Figure 6. Engine Oil Cooler Lines and Fittings Installation.
ENGINE OIL SAMPLING VALVE AND FITTINGS REPLACEMENT

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 1 Page Navigation
  483    484    485    486    487  488  489    490    491    492    493  
img
. . .
TM 5-3895-379-23-1
0097
INSTALLATION - Continued
9.
Place clamp (Figure 8, Item 2) on hose (Figure 8, Item 3).
10.
Install hose (Figure 8, Item 3) on elbow (Figure 8, Item 1) and tighten clamp (Figure 8, Item 2).
1
2
3
M0111SWR
Figure 8. Engine Oil Cooler Lines and Fittings Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Lower operator platform assembly. (Volume 2, WP 0235)
2.
Fill cooling system to proper level. (WP 0139)
3.
Refill oil. (WP 0077)
4.
Start engine and check for leaks. (TM 5-3895-379-10)
END OF TASK
END OF WORK PACKAGE
0097-6
03/15/2011Rel(1.8)root(maintwp)wpno(M00036)