• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. MAINTENANCE ALLOCATION CHART - Continued
SECTION III - TOOL. AND TEST EQUIPMENT REQUIREMENTS

Maintenance Manual For Roller, Pneumatic Tired Variable Pressure, Self-Propelled (Cce) Page Navigation
  161    162    163    164    165  166  167    168    169    170    171  
img
APPENDIX C
Section II. MAINTENANCE ALLOCATION CHART.
FOR
VARIABLE PRESSURE SELF-PROPELLED (CCE)
ROLLER, PNEUMATIC TIRED,
Reservoirs
Replace
4.0
EARTH MOVING EQUIP-
MENT COMPONENTS
Spray Pump and
Replace
1
2.0
Repair
Motor
2.0
Water Tank Inlet
Replace
0.3
Screen
W a t e r Tank Sump
Replace
0.3
Filter
Spray Manifolds and
Replace
0.5
Nozzles
Repair
1.0
Spray Pipes, Valves
1.0
Replace
a n d Hoses
Repair
1.0
*The subcolumns are as follows:
C-operator/crew
O-organizational
22
F-direct support
H-general support
D-depot


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.