• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Section II. MAINTENANCE ALLOCATION CHART - Continued
Section II. MAINTENANCE ALLOCATION CHART - Continued

Maintenance Manual For Roller, Pneumatic Tired Variable Pressure, Self-Propelled (Cce) Page Navigation
  157    158    159    160    161  162  163    164    165    166    167  
img
APPENDIX C
Section II. MAINTENANCE ALLOCATION CHART
FOR
ROLLER, PNEUMATIC TIRES, VARIABLE PRESSURE SELF-PROPELLED (CCE)
Replace
Battery Cables
0.4
Repair
0.5
1,5
Replace
1.0
0613
Wiring Harness
Repair
1.0
TRANSMISSION
07
1,2,3,4
Transmission
Test
2.0
0700
Service
0.3
Replace
16.0
16.0
Repair
Overhaul
20.0
Service
3-Speed Transmis-
0.5
Replace
sion
16.0
Repair
8.0
Overhaul
8.0
Forward-Reverse
Service
0.5
Transmission
Replace
16.0
Repair
8.0
Overhaul
8.0
Clutch Pack
Replace
4.0
Repair
4.0
1,2
Adjust
Control Valve
0703
1.0
Replace
1.0
Repair
1.0
Control Cable
Adjust
0.5
Replace
2.0
Repair
1.0
16.0
Torque Converter
Replace
0708
1,2
8.0
Repair
Transmission
Oil
Service
0.5
Filter
Replace
1.0
Oil Filter Element
Replace
0.5
*The subcolumns are as follows
C-operator/crew
O-organizational
18
F-direct support
H-general support
D-depot


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.