TM 5-3895-379-23
VIBRATORY COOLING/CONTROL VALVE REPLACEMENT - CONTINUED
0205 00
INSTALLATION
WARNING
Use caution when handling heavy parts. Provide adequate support and use assistance during procedure.
Failure to follow this warning may cause injury or death.
NOTE
The weight of the vibration cooling/control valve is 62 lb (28 kg.).
Prior to installation, lubricate O-rings with a light coat of lubricating oil.
1.
Install four new O-rings (9) on spacer (8) and vibratory cooling/control valve (2).
2.
With assistance, position vibratory cooling/control valve and spacer (8) to vibratory pump (7) and install six bolts
(6).
NOTE
Remove caps and plugs before connecting hose assemblies.
3.
Connect seven hose assemblies (5) to vibratory cooling/control valve (2).
4.
Position electrical harness to bracket (4) and fasten cable ties (3) to secure electrical harness.
5.
Connect two electrical connectors (1) to vibratory cooling/control valve (2).
6.
7.
Operate roller and test for proper operation and leaks (TM 5-3895-379-10).
END OF WORK PACKAGE