TM 5-3895-379-23
INSTRUMENT WIRING HARNESS REPLACEMENT - CONTINUED
0112 00
REMOVAL - CONTINUED
25.
Remove three screws (71), wires (72), (73) and (74) and lockwashers (75) from starter switch assembly terminals (76),
71
73
75
77
76
71
72
75
80
71
75
74
78
401-612
NOTE
Perform steps 26 through 30 for the CB534C Roller.
26.
Remove lamp assembly (79) from Feet Per Minute (FPM) meter (80).
27.
Remove nut (81), instrument wiring harness connector (82) and washer (83) from FPM meter (80).
28.
Remove nut (84), instrument wiring harness connector (85) and washer (86) from FPM meter (80).
29.
Remove nut (87), instrument wiring harness connector (88) and washer (89) from FPM meter (80).
30.
Remove nut (90), instrument wiring harness connector (91) and washer (92) from FPM meter (80).
31.
Remove instrument wiring harness assembly (15) from instrument box assembly (4).
81
85
88
84
87
89
86
91
90
82
92
83
79
80
4
15
401-2174
0112 00-8