TM 5-3895-379-23
THROTTLE CONTROL REPLACEMENT (CB534C) - CONTINUED
0047 00
ADJUSTMENT
CAUTION
Make sure rod linkage is attached before connecting the engine speed control solenoid to prevent damage to
the engine speed control solenoid.
1.
Align the engine speed control solenoid (10) with governor control shaft (6).
2.
Move the engine speed switch to HIGH position (TM 5-3895-379-10).
3.
Battery disconnect switch in OFF position (TM 5-3895-379-10).
4.
Move the key switch to ON position to energize engine speed control solenoid (10). Do not start engine.
5.
Loosen locknuts (12) on rod linkage (13).
6.
Adjust rod linkage (13) until lever (14) on governor control shaft (6) contacts stop for HIGH idle.
7.
Tighten locknuts (12) on rod linkage (13).
8.
Cycle the engine speed switch to ensure lever (14) contacts HIGH idle stop.
9.
Manually move plunger of engine speed control solenoid (10) and check for binding of linkage. Adjust linkage as
needed.
10.
Close right-side door assembly (TM 5-3895-379-10).
11.
12.
Start engine and check for proper operation (TM 5-3895-379-10).
END OF WORK PACKAGE
0047 00-3/(0047 00-4 Blank)