TM 5-3895-379-23-2
FIELD MAINTENANCE
PREPARATION FOR STORAGE AND SHIPMENT
INITIAL SETUP:
References (cont.)
Materials/Parts
TM 5-3895-379-10
Volume 1, WP 0004
Diesel Fuel (WP 0288, Table 1, Item 21, 22, 23)
Volume 1, WP 0005
Lubricating Oil MIL-L-460002, 1 Grade
Volume 1, WP 0071
Volume 1, WP 0100
Tape PSA-Clear-Backing
Volume 1, WP 0118
Volume 1, WP 0121
Volume 1, WP 0124
Volume 1, WP 0127
Personnel Required
Volume 1, WP 0129
Construction Equipment Repairer 91L
Volume 1, WP 0134
Volume 1, WP 0151
Volume 1, WP 0191
References
AR 190-13
TM 43-0139
TM 43-0209
SECURITY PROCEDURES
For security procedures involved in storage and shipment of the roller, refer to AR 190-13.
END OF TASK
STORAGE INSTRUCTIONS
1.
Short Term Storage (90 Days or Less).
CAUTION
If short term storage is to occur during times when air temperature may fall below 0F
(-18C), long term storage procedures must be used.
a.
Fill fuel tank completely (TM 5-3895-379-10).
b.
Perform AFTER operation Preventive Maintenance Checks and Services (TM 5-3895-379-10).
c.
Park roller:
(1)
Park roller on a level surface;
(2)
block roller to prevent movement; and
(3)
ensure that roller is parked in a position to allow periodic movement and allow roller to be driven
away after storage.
d.
Perform final walk-around inspection to ensure that all panels, access doors, container caps, and
fasteners are firmly secured.
e.
Every 45 to 60 days roller must be exercised:
0281-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00219)