• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Water Spray Check Valve Installation.
WATER SPRAY SCREEN ASSEMBLY MAINTENANCE (CB534C)

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 2 Page Navigation
  316    317    318    319    320  321  322    323    324    325    326  
img
.
TM 5-3895-379-23-2
0274
INSTALLATION - Continued
5.
Lift water tank (Figure 4, Item 1) and remove wood block (Figure 4, Item 2) from between tank and drum
(Figure 4, Item 3).
6.
Lower water tank (Figure 4, Item 1) on bumper assembly (Figure 4, Item 4).
7.
Install two straps (Figure 4, Item 7) on bumper assembly (Figure 4, Item 4) with two washers
(Figure 4, Item 6) and nuts (Figure 4, Item 5). Tighten nuts until strap tension is snug.
1
2
7
6
5
4
3
M0266SWR
Figure 4. Water Spray Check Valve Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Fill water spray system. (TM 5-3895-379-10)
2.
Start engine, operate water spray system, and check for leaks. (TM 5-3895-379-10)
3.
Remove chocks. (TM 5-3895-379-10)
END OF TASK
END OF WORK PACKAGE
0274-5/6 blank
03/15/2011Rel(1.8)root(maintwp)wpno(M00212)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.