• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RAISE/LOWER OPERATOR PLATFORM ASSEMBLY - Continued
Figure 1. Operator Platform and Operator Station Removal

Technical Manual For Roller, Motorized, Vibrating Tandem Steel Drums - 2 Page Navigation
  87    88    89    90    91  92  93    94    95    96    97  
img
. . . . . . .
TM 5-3895-379-23-2
0236
FIELD MAINTENANCE
OPERATOR PLATFORM AND OPERATOR STATION REPLACEMENT
INITIAL SETUP:
References
Tools and Special Tools
TM 5-3895-379-23P, Figures 101, 102, and 103
Tool Kit, General Mechanic's: Automotive
(WP 0289, Table 1, Item 39)
Lifting Device, Minimum Capacity 1,250 lb (567 kg)
Equipment Condition
Link (WP 0289, Table 1, Item 22)
Rollover protection structure (ROPS) removed.
(WP 0234)
Operator platform assembly raised. (WP 0235)
Materials/Parts
Left- and right-side door assemblies opened.
Cap Set, Protective, Dust and Moisture Seal
(TM 5-3895-379-10)
(WP 0288, Table 1, Item 12)
Tag, Marker (WP 0288, Table 1, Item 70)
Personnel Required
Construction Equipment Repairer 91L (2)
0236-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00174)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.