(4) free of roll (5). Shims (6) may have been used
5-6. Roll and Shaft Assembly
between frame and flex mounts (7}) to give an initial
compression of approximately 1 / 16 inch to the flex
(2) Place sling lifting hooks into eyes (1) and lift
mounts.
b. Installation. Installation is in the reverse of removal.
sling until hooks are taut in eyes. Do not lift roller.
(3) Remove nuts (2), bolts (3) and lift roller frame
KEY TO FIGURE 5-3:
1
Eye
2
Nut
3
Bolt
4
Frame
5
Roll
6
Shim
7
Flex Mount
5-4