1 Nut
2 Bolt
3 Shim
4 Bolt
5 Washer
6 Washer
7 Support
8 Bolt
9 Washer
10 Power takeoff
11 Engine
Figure 5-1. Power takeoff removal.
5-5. Engine Assembly
(5) Disconnect hose (3) at engine (4), and remove
hose from engine.
(6) Remove nut (5) and battery cable (6) from
starter (7).
(3) Turn fuel strainer shutoff valve to closed
(7) Remove wire (8), bolts (9), and washers (10).
(8) Attach suitable lifting device to engine.
(4) Disengage latches (1) and remove engine top
Reference TM 5-2805-258-14, and lift engine free.
shroud (2).
b. Installation. Installation is in the reverse of removal.
5-2