TM 5-3895-383-24
36.
Disconnect hose assemblies (33), (36), (37) and (39)
from the propel pumps. Cap and plug immediately.
37.
Remove the cotter pin and pin that fastens control cable
(38) to the propel pump. Loosen the jam nut and
remove control cable (38) from the bracket. Move the
control cable out of the way.
38.
Mark electrical connectors (34) for assembly purposes.
Remove the screws that fasten electrical connectors
(34) to the control valves on the propel pumps. Remove
the electrical connectors from the propel pumps.
39.
Remove the cable ties that fasten wiring harness (35) to
the pumps. Move the wiring harness out of the way.
40.
Attach a Tooling (A) and a hoist to the engine as shown.
Remove four mounting bolts (41), and remove engine
(40) and the pumps as a unit from the machine. The
weight of the engine and pumps as a unit is
approximately 726 kg (1600 lb).
NOTE:
For the installation of the engine, reverse the
removal steps.
NOTE:
After the engine has been installed, fill the cooling
system with coolant to the correct level. Fill the
hydraulic oil system with hydraulic oil to the
correct level. See the Operation & Maintenance
Manual, Form No. KEBU7503, for the correct
procedures.
End By:
a.
*tilt operator's platform or lower cab
* This procedure is in the Machine Systems Disassembly &
Assembly module, Form No. KENR7037.
9-19