TM 5-3895-383-24
(8)
Insert tube (11) through hole in apron (18).
(9)
Install two clamps (14) on tube (11).
(10)
Install bracket (16) on hydraulic oil tank (17)
with two bolt (15), washers (12), clamps (14),
washers (13) and nuts (12).
(11)
Install tube (11) to valve (4) and tighten
connector (10).
(12)
Connect connector (8) to wiring harness (9).
(13)
Install cable tie (7) on connector (8) and wiring
harness (9).
NOTE
If Roller's mission will not require
installation of ether canister, stop here
and perform Follow-on Maintenance. If
Roller's mission will require installation
of ether canister, continue beginning with
Step (14).
(14)
Remove cap (5) from valve (4).
(15)
Install cap (5) on cap holder (6).
(16)
Install ether canister (2) in clamp (3) and valve
(4).
(17)
Tighten ether canister (2) securely on valve (4).
(18)
Tighten wing nut (1).
NOTE
Follow-on Maintenance:
· Close hood (TM 5-3895-383-10).
· Remove chocks.
END OF TASK
2-6