TM 5-3895-379-23
OPERATOR PLATFORM AND OPERATOR STATION REPLACEMENT - CONTINUED
0202 00
REMOVAL - CONTINUED
13.
Remove bolt (20) from each side of the front rail assembly.
NOTE
The weight of the operator platform is 1050 lb (476 kg).
14.
Install lifting bracket to each corner of the operator platform (21).
20
401-2204
15.
Install lifting device and remove operator platform (21) from roller.
16.
Position operator platform (21) securely on wooden blocks.
21
401-100
0202 00-7