TM 5-3895-379-23
OPERATOR PLATFORM AND OPERATOR STATION REPLACEMENT - CONTINUED
0202 00
INSTALLATION - CONTINUED
NOTE
The weight of the operator platform is 1050 lb (476 kg).
5.
Attach lifting device and install operator platform (21) to roller.
21
401-100
6.
Remove lifting bracket from each corner of operator platform (21).
7.
Install bolt (20) to each side of the front rail assembly.
20
401-2204
0202 00-12