TM 5-3895-379-23-2
0245
INSTALLATION
1.
Install toolbox (Figure 2, Item 4) on operator platform (Figure 2, Item 5) with two screws (Figure 2, Item 2),
washers (Figure 2, Item 3), and nuts (Figure 2, Item 6). Tighten nuts to 35 lb-ft (47 Nm).
2.
Close lid (Figure 2, Item 1) of toolbox (Figure 2, Item 4).
1
2
3
4
6
5
M0808SWR
Figure 2. Toolbox Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Remove chocks. (TM 5-3895-379-10)
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00183)