OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
A-After
W-Weekly
M-Monthly
D-During
B-Before
APPENDIX M
ITEM TO BE INSPECTED
INTERVAL
Equipment is not ready/
Check for and have repaired, filled or
PROCEDURE :
ITEM
AVAILABLE IF:
a d j u s t e d as needed
NO
B
D
A
W
M
5
TIRES
One or more missing,
Check for cuts and general condition.
a.
flat, and/or unservice-
b.
Tires fail to
able.
inflate.
6
CONTROLS
AND
INSTRUMENTS
(Check
for
proper
indication
and operation)
a.
Slight (+) Charge
Engine oil pressure and
Engine Coolant Temperature Gage
b.
coolant gages indicate
160o-185oF normal operation
abnormal operation.
Engine Oil Pressure
c.
40-60 PSI normal operation
indicate red.
Gages
Transmission Oil Temperature
d.
GREEN/RED
Hourmeter
e.
f.
Fuel Gage
Gage Tire Pressure
g.
35-140 PSI max depending on tire PLY and mission.
Controls (i.e., steering, shifting, etc)
h.
Check for proper operation
7
WATER SPRAY SYSTEM/TANK
Check strainer and clean with water if required.
a.
Check water spray nozzle and clean if required.
b.
8
COCO MATS
One or more missing.
Check for missing or worn mats.