TM 5-3895-379-23-2
0281
STORAGE INSTRUCTIONS - Continued
3.
Removing Roller from Long Term Storage.
a.
Remove all coverings and tape.
b.
Install fully charged batteries or new batteries (Volume 1, WP 0191).
c.
Connect plug-in lead to alternator (Volume 1, WP 0151).
d.
Perform all Operator PMCS (TM 5-3895-379-10) and Field Maintenance PMCS (Volume 1, WP 0071).
e.
On first day of operation, check roller periodically for leaks and proper operation. Troubleshoot as
required (Volume 1, WP 0004) and (Volume 1, WP 0005).
END OF TASK
SHIPMENT INSTRUCTIONS
1.
Completely drain front and rear water tanks (TM 5-3895-379-10).
2.
Perform Operator PMCS procedures (TM 5-3895-379-10).
3.
Prepare roller to point required by distance and duration of shipment. If duration of shipment will last more than
three months, roller should be prepared for storage.
END OF TASK
END OF WORK PACKAGE
0281-5/6 blank
03/15/2011Rel(1.8)root(maintwp)wpno(M00219)