TM 5-3895-379-23
DRUM SCRAPER REPLACEMENT - CONTINUED
0160 00
ADJUSTMENT
NOTE
A small amount of preload on the scraper may be necessary to increase effectiveness.
1.
Install scraper (4) so that scraper contacts drum sur-
face firmly and evenly from end-to-end without
bending.
2.
Tighten locknuts (1) to 60 lb-ft (81 Nm) from center
of scraper outward while applying pressure on plate
(6) to ensure a small amount of preload on the
scraper.
6
1
4
401-678
3.
Remove chocks (TM 5-3895-379-10).
END OF WORK PACKAGE
0160 00-9/(0160 00-10 Blank)