TM 5-3895-379-23
TURBOCHARGER REPLACEMENT - CONTINUED
0035 00
INSTALLATION
NOTE
Apply antiseize compound to threads of studs and screws before installation.
1.
With assistance, install new gasket (19) and turbocharger (3) on exhaust manifold (16) with four nuts (15). Tighten nuts
to 32 lb-ft (44 Nm).
2.
For CB534C Roller only, connect actuator arm (14) to turbocharger any install clip (13).
3.
With assistance, install turbocharger bracket (18) with three screws (15). Tighten screws to 22-30 lb-ft (30-41 Nm).
14
13
15
16
17
19
18
401-2220
4.
Slide hose (11) up tube (12) and tighten two hose
clamps (10) to connect hose to turbocharger (3) and
3
tube.
CAUTION
Turbocharger must be pre-lubricated or
damage to turbocharger will occur when
engine is started.
10
5.
Add clean engine oil to oil inlet on turbocharger (3)
until full. Refer to KEY in WP 0008 00, Field Mainte-
nance Preventive Maintenance Checks and Services
(PMCS) Introduction, for correct grade of oil. Spin
11
401-327
12
turbine wheel several times in order to lubricate the
bearing.
6.
Refill oil inlet with oil.
0035 00-4