(19) Install the stationary support bracket locking screws (5 and 32), lockwashers (19 and 14), and plate washers
(20 and 31). Do not tighten the screws.
(20) Connect the condenser lead and coil lead (25) with the breaker arm (23) and tighten the screw (27) and
lockwasher (26).
(21) Adjust the breaker point gap to 0.015 inch at full separation (par. 116e) and tighten the locking screws (5
and 32).
(22) Install the distributor rotor (17).
(23) Install the brush (8) in the distributor block (7).
(24) Install the ground cable terminal (33), insulator washer (35), insulator (34), and ferrule (36) in the end cap
(2). Install and tighten the ground cable nut (37).
(25) Install the distributor block (7) in the end cap (2) and tighten the mounting screws (18).
(26) Install the high-tension lead rod (9) and high-tension inserts (1) on the end cap (2).
(27) Assemble the vent screens (3) and vent hoods (4) on both sides of the end cap (2). Tighten the mounting
screws (5).
(28) Position the gasket (6) on the end cap (2) and see that the mounting holes in the gasket and cap are
properly alined.
(29) Attach the end cap (2) to the drive end frame (14, fig. 102) and line the mounting holes in the gasket, end
cap, and drive end frame. Install and tighten the mounting screws (39, fig. 101) firmly and evenly.
(30) Install the gaskets (23, fig. 102) and spacer (24).
(1) Remove the cover band screw (23) and nut (25). Remove the cover band (24).
(2) Remove the shaft nut (1) and shaft nut lockwasher (2).
(3) Remove the groove pulley (3), fan (4), and key (5).
(4) Remove the through bolts (26) and lockwashers (28) securing the commutator end frame (16) and the drive
(5) Pull the commutator end frame (16) away from the generator frame (38) slightly.
(6) Remove the brush lead screws (21), lockwashers (20), and brush spacer washers (19).
Remove the
brushes (18).
(7) Lift up and remove the tension levers (22) and brush springs (17).
256