TM 5-3895-379-23-2
0235
RAISE PLATFORM - Continued
4.
Remove two locknuts (Figure 3, Item 3), washers (Figure 3, Item 6), and screws (Figure 3, Item 7) from stowage
locations (Figure 3, Item 5) in frame assembly (Figure 3, Item 4). Discard locknuts.
5.
Attach short section of chain (Figure 3, Item 9) securely in each cutout in front of sides of yoke assembly
(Figure 3, Item 8).
6.
Attach a wire rope hoist (Figure 3, Item 10) to each chain and to eyelets in handrail assemblies
(Figure 3, Items 1 and 2).
WARNING
Use caution when handling heavy parts. Provide adequate support and use assistance during
procedure. Ensure that any lifting device used is in good condition and of suitable load
capacity. Keep clear of heavy parts supported only by lifting device. Failure to follow this
warning may cause injury or death.
CAUTION
Operate wire rope hoists evenly to decrease chance of equipment failure.
7.
With assistance, use wire rope hoists (Figure 3, Item 10) to lift operator platform assembly (Figure 2, Item 1)
until operator platform mount clears bolt path in frame assembly.
8.
Install two screws (Figure 3, Item 7), washers (Figure 3, Item 6), and new locknuts (Figure 3, Item 3) in platform
locking hole frame assembly (Figure 3, Item 4) and operator platform assembly (Figure 2, Item 1). Tighten
locknuts to 48-55 lb-ft (65-75 Nm).
0235-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00173)